Power substation and power pole after update

I’m having issues connecting power poles to a substation. It seems that after the update the first power pole needs to be right next to a substation to be able to connect to the substation. So now you end up with more power poles than before the update.

The same applies when you want to connect 2 power poles, now they have to be within 1 block from each other to connect.

+1 same here - my current workaround is to drop a pole near by to connect, then drag it farther and that way power lines extend properly

1 Like

+1
While the workaround works quite reliably, placing down the poles to create your grid doesn’t feel very natural anymore.