Hey, Not sure if intended or not. If you build a woodcutter plot, establish the equipment near town, then extend the plot to trees, you can then disconnect the plot (like right click to remove plot connection areas) and continue to expand the plot where the trees are. Workers will work both plot by town and the plot with trees. You can even leave a bunch of small sections just where the rocks or trees are as long as it was initially connected to the plot, or extended from part that used to be. When i just try to build a woodcutter plot in the area it wants the tools etc and the ones on the first spot dont go to the second plot. It lets me bypass the work of moving the buildings needed when the nodes in the plot dry up. I can consistently replicate.
Save file has me testing if i could force them to go to a second plot with just a sign at the end.
Cozy Casual - Save 4.zip (3.2 MB)
The copper mining is currently running this way, but woodcutters i just cleaned up for testing.